Garage/ Storage- Residential
Building
Record NumberBLD2022-00205
Closed
    Current Fees
$0.00
Additional fees may be required
     
 

Project Information  

At this time, this permit type cannot be issued through the portal. Once permit is listed as Waiting for Pickup (after approvals and processing), please pick up the permit at our offices at 615 W Alder St., Shelton, WA 98584 during normal business hours.

Location  
375 E Strong Rd Parcel
Shelton, WA 98584 221331290002
 
 
Created 2/18/2022
Submitted 2/18/2022
Approved 4/28/2022
Issued 5/2/2022
Closed 8/2/2024
Application Expires 8/19/2024
Give your project a name
Describe the purpose of the project
Details  

(view notes)
(view notes)
(view notes)
(view notes)
(view notes)
(view notes)
(view notes)
(view notes)
(view notes)
(view notes)
(view notes)
(view notes)
(view notes)
(view notes)
(view notes)
(view notes)
(view notes)
(view notes)
(view notes)
(view notes)
(view notes)
Fixtures  

*Required for Application
Mechanical fixtures  
Enter Quantity Value Per Unit Value
Air Handlers- Miscellaneous (view notes) $14.00 Each $0.00
Dryer Vent(s) (view notes) $10.00 Each $0.00
Ductless Heat Pump (view notes) $19.00 Each $0.00
For each air-handling unit over 10,000 cfm (4719L/s) (view notes) $23.00 Each $0.00
For each air-handling unit to and including 10,000 cubic feet per minute (cfm) (4719L/s), including attached ducts. (view notes) $14.00 Each $0.00
For each appliance or piece of equipment regulated by the Mechanical Code but not classed in other Appliance categories, or for which no other fee is listed in the table (view notes) $14.00 Each $0.00
For each ventilation fan connected to a single duct (view notes) $10.00 Each $0.00
For each ventilation system which is not a portion of any other permitted heating or air-conditioning system (view notes) $14.00 Each $0.00
For the installation of each hood which is served by mechanical exhaust, including the ducts for each hood (view notes) $14.00 Each $0.00
For the installation or relocation of each boiler or compressor over 30 horsepower (105.5 kW) to and Including 50 horsepower (176 kW), or each absorption system over 1,000,000 Btu/h (293.1 kW) to and including 1,750,000 Btu/h (512.9 kW) (view notes) $70.00 Each $0.00
For the installation or relocation of each boiler or compressor over 30 horsepower (105.5 kW) to and Including 50 horsepower (176 kW), or each absorption system over 1,000,000 Btu/h (293.1 kW) to And including 1,750,000 Btu/h (512.9 kW) (view notes) $70.00 Each $0.00
For the installation or relocation of each boiler or compressor over 30 horsepower (52.7 kW) to and Including 30 horsepower (105.5 kW), or each absorption system over 500,000 Btu/h (146.6 kW) to and Including 1,000,000 Btu/h (293.1 kW) (view notes) $46.00 Each $0.00
For the installation or relocation of each boiler or compressor over 30 horsepower (52.7 kW) to and Including 30 horsepower (105.5 kW), or each absorption system over 500,000 Btu/h (146.6 kW) to and Including 1,000,000 Btu/h (293.1 kW) (view notes) $46.00 Each $0.00
For the installation or relocation of each boiler or compressor over 50 horsepower (176 kW) or each Absorption system over 1,750,000 Btu/h (512.9 kW) (view notes) $115.00 Each $0.00
For the installation or relocation of each boiler or compressor over 50 horsepower (176 kW) or each Absorption system over 1,750,000 Btu/h (512.9 kW) (view notes) $115.00 Each $0.00
For the installation or relocation of each boiler or compressor over three horsepower (10.6kW) to and including 15 horsepower (52.7kW), or each absorption system over 100,000 Btu/h (29.3 kW) to and including 500,000 Btu/h (146.6kW) (view notes) $35.00 Each $0.00
For the installation or relocation of each boiler or compressor over three horsepower (10.6kW) to And including 15 horsepower (52.7kW), or each absorption system over 100,000 Btu/h (29.3 kW) to And including 500,000 Btu/h (146.6kW) (view notes) $35.00 Each $0.00
For the installation or relocation of each boiler or compressor to and including 3 horsepower (10.6 kW), Or each absorption system to and including 100,000 Btu/h(29.3kW) (view notes) $19.00 Each $0.00
For the installation or relocation of each boiler or compressor to and including 3 horsepower (10.6 kW), Or each absorption system to and including 100,000 Btu/h(29.3kW) (view notes) $19.00 Each $0.00
For the installation or relocation of each commercial or industrial-type incinerator (view notes) $18.00 Each $0.00
For the installation or relocation of each domestic-type incinerator (view notes) $23.00 Each $0.00
For the installation or relocation of each floor furnace, including vent (view notes) $19.00 Each $0.00
For the installation or relocation of each forced-air or gravity-type furnace or burner, including ducts and Vents attached to such appliance (view notes) $23.00 Each $0.00
For the installation or relocation of each forced-air or gravity-type furnace or burner, including ducts and vents attached to such appliance, up to and including 100 Btu/h (29.3 kW) (view notes) $19.00 Each $0.00
For the installation or relocation of each suspended heater, recessed wall heater or floor-mounted unit heate (view notes) $19.00 Each $0.00
For the installation, relocation or replacement of each appliance vent installed and not included in another permit (view notes) $10.00 Each $0.00
Furnace(s) (view notes) $19.00 Each $0.00
Gas Outlet(s) (1-5) (view notes) $7.00 Each $0.00
Gas Outlets Each Additional (view notes) $2.00 Each $0.00
Heat Pump(s) (view notes) $19.00 Each $0.00
Kitchen Exhaust Hood(s) (view notes) $14.00 Each $0.00
Liquid propane tank, above ground tank, below ground fuel storage tank (Residential Only) (view notes) $80.00 Each $0.00
Other (view notes) $14.00 Each $0.00
Propane Tank(s) (view notes) $80.00 Each $0.00
Repairs or Additions for the repair or, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit of each heating, cooling absorption or evaporative cooling system, including installation of controls regulated by the Mechanical Code (view notes) $17.00 Each $0.00
Solid Fuel Burning Equipment: Wood, Pellet, LP and fireplace, barbeque appliances (view notes) $80.00 Each $0.00
Spot Vent Fan(s) (view notes) $10.00 Each $0.00
Wood/Gas/Pellet Stove(s) (view notes) $80.00 Each $0.00

Plumbing fixtures  
Enter Quantity Value Per Unit Value
Additional gas-piping system outlet, per outlet (view notes) $2.00 Each $0.00
Bathroom Sink (view notes) $9.00 Each $0.00
DRINKING FOUNTAIN (view notes) $9.00 Each $0.00
FLOOR DRAIN (view notes) $9.00 Each $0.00
FLOOR SINK (view notes) $9.00 Each $0.00
For atmospheric-type vacuum breakers (first 1-5) (view notes) $7.00 Each $0.00
For each additional atmospheric-type vacuum breaker over the amount of 5 (view notes) $2.00 Each $0.00
For each additional medical gas inlet(s)/outlet(s) (view notes) $7.00 Each $0.00
For each annual cross-connection testing of a reclaimed water system (including initial test) (view notes) $80.00 Each $0.00
For each backflow protective device other than atmospheric type vacuum breakers 2 inch (51mm) diameter and smaller (view notes) $9.00 Each $0.00
For each backflow protective device other than atmospheric type vacuum breakers over 2 inch (51mm) diameter (view notes) $20.00 Each $0.00
For each gray water system (view notes) $50.00 Each $0.00
For each installation, alteration or repair of water piping and/or water treating equipment (view notes) $9.00 Each $0.00
For each lawn sprinkler system on any one meter including associated backflow protection devices (view notes) $9.00 Each $0.00
For each medical gas piping system serving 1-5 inlet(s)/outlet(s) for a specific gas (view notes) $65.00 Each $0.00
For each plumbing fixture on one trap or a set of fixtures on one trap (including water, drainage piping and associated backflow protection) (view notes) $9.00 Each $0.00
For each repair or alteration of drainage or vent piping, each fixture (view notes) $9.00 Each $0.00
For initial installation and testing for a reclaimed water system (view notes) $80.00 Each $0.00
Gas-piping systems (for first set of 1-5 outlets) (view notes) $7.00 Each $0.00
LAUNDRY TRAY (view notes) $9.00 Each $0.00
Number of Bath Tubs (view notes) $9.00 Each $0.00
Number of Clothes Washers (view notes) $9.00 Each $0.00
Number of Dishwashers (view notes) $9.00 Each $0.00
Number of Hose Bibs (view notes) $7.00 Each $0.00
Number of Kitchen Sinks (view notes) $9.00 Each $0.00
Number of Showers (view notes) $9.00 Each $0.00
Number of Toilets (view notes) $9.00 Each $0.00
Number of Water Heaters and or Vent (view notes) $9.00 Each $0.00
Other (view notes) $9.00 Each $0.00
SINK-3 WITH DRAIN (view notes) $9.00 Each $0.00
URINAL (view notes) $9.00 Each $0.00

Solar  
Enter Quantity Value Per Unit Value
Solar Panel(s) (view notes) $19.00 Each $0.00

Submittals At least 1 file must be uploaded for each submittal requirement  

Please ensure all required submittals have been uploaded. All required submittals must be received prior to routing for review and being considered a complete application. Required submittals are marked with red asterisk unless directed otherwise. Mason County staff will contact you if submittal(s) are found insufficient via email or phone.

*Required for Application
Required before application can be closed
Submittal Name Received Version Status
Site Plan* (view notes)2/18/2022 1 InReview  
Construction Plans* (view notes)2/18/2022 1 Approved  
Engineered Calculations* (view notes)2/18/2022 1 Approved  
Foundation Plan* (view notes)2/18/2022 1 Approved  
Roof Plan* (view notes)2/18/2022 1 Approved  
Small Parcel Stormwater Application/Worksheet* (view notes)2/18/2022 1 Approved  
Parcels  

If you click on the blue parcel number below, you will be able to view information related to the parcel.

Parcel Number Primary Owner Primary Address
221331290002 (view notes) GRAY ET AL TIMOTHY J & SHAE M 375 E STRONG RD SHELTON, WA 98584
Conditions  

The Owner/Applicant agree to the permit conditions at issuance. Prior to issuance, conditions are subject to change.

The use, handling and storage of hazardous materials or flammable and combustible liquids in excess of 10 gallons is not allowed without the approval of the Mason County Fire Marshal.  (view notes)  
Retaining walls needed to support a surcharge such as structures, roads, or to support slopes, shall require a separate building permit and approval prior to construction of the retaining wall.  (view notes)  
Concrete used for basement walls, foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather, garage floor slabs and other vertical concrete work exposed to the weather shall have a minimum compressive strength of 3000 psi (IRC Table R402.2).  (view notes)  
All property lines shall be clearly identified at the time of foundation inspection.  (view notes)  
Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site plan. Please check your "Approved Site Plan" to ensure these structures are shown and meet the setback conditions listed.  (view notes)  
Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of pressure treated material.  (view notes)  
All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way.  (view notes)  
All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration. Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No more than one extension may be granted.  (view notes)  
By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your "Approved Site Plan" to ensure these structures meet the setback conditions listed.  (view notes)  
When parcel development requires direct access to county road(s), a Road Access Permit or Approval must be granted by the Mason County Department of Public Works. For more information contact Public Works, at (360) 427-9670, ext. 450 or 100 W Public Works Dr. Shelton. The building permit will not be finaled until the permit holder can show proof that the access permit from Public Works has been finaled and approved.  (view notes)  
All changes to "approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction.  (view notes)  
Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project.  (view notes)  
All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation.  (view notes)  
The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150' from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road.  (view notes)  
Concrete encased grounding electrodes must be installed and used at each new building or structure that is built upon a permanent concrete foundation. In Mason County the electrical code is regulated by Washington State Department of Labor & Industries (L&I). For more information contact L&I for additional information. In Olympia call (360)902-6350 and in Bremerton call (360)415-4000.  (view notes)  
A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit application. Design, sizing, placement, inspection and maintenance of stormwater management systems shall be the responsibility of the owner/agent of the developed parcel. It is the owner/agent/contractor’s responsibility to ensure that Mason County Department of Public Works has approved the stormwater site plan for this parcel prior to the commencement of any development activities. *NOTE if Stormwater Management option “A” was selected on the Small Parcel Stormwater Management Application/Worksheet the document entitled “Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan” constitutes an approved plan based on the criteria listed on the application/worksheet. If the development has, or will have, a septic/drainfield system you are responsible for contacting Mason County Division of Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this, or any other, parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final inspection of the building permit the owner/agent/contractor is acknowledging that all components of the stormwater management system have been installed as approved on the stormwater site plan. Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project.  (view notes)  
REQUIREMENTS FOR ROOF COVERINGS. Roof coverings shall be applied in accordance with the applicable provisions of the current code and the manufacturer's installation instructions. A drip edge shall be provided at eaves and gables of shingle roofs.  (view notes)  
WIND LOADS - Roof coverings shall be designed and tested to withstand the maximum basic wind speed. The basic wind speed for Mason County is 85 MPH.  (view notes)  
The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour) will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted.  (view notes)  
The foundation/footing must be placed on undisturbed, firm-native soil.  (view notes)  
The plan review check list and corrections are part of the approved plans and must remain attached. It is the responsibility of the applicant, owner or contractor to make the required corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or removal of approved documents will result in failure of required building inspections.  (view notes)  
Owner / Agent is responsible to post the assigned address and/ or purchase and post private road signs in accordance with Mason County Title 14.28 and 14.17.  (view notes)  
All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour) will be charged and must be collected by the Building Department prior to any further inspections being performed or approvals granted.  (view notes)  
Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law.  (view notes)  
Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure.  (view notes)  
CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections.  (view notes)  
All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations.  (view notes)  
OWNER / BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s) for review and inspection. This permit/application becomes null & void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION.  (view notes)  
This structure is approved as unheated space. To be considered unheated space the area may be provided with a heating system that does not exceed maxium output of 1 watt per square foot., or 3.4 Btu/h per square foot. A permit and approval is required prior to installation of any heating system. When a heating system exceeds 1 watt per sq. ft (or 3.4 btu/h per sq. ft) the heated space shall be insulated in accordance with the energy code in effect at the time of permit application.  (view notes)  
Applicant/ Owner assumes all responsibility if On-site Sewage Components are encumbered. A.) Drainfield/ Reserve requires a 10ft setback from all footing/foundations. B.) Septic tank(s) requires 5ft setback from all footing/foundations. C.) No foundation/ Perimeter Drains within 30ft, down gradient of Drainfield/ Reserve area. D.) No Cut Bank(s) (greater than 5ft and over 45 degrees) within 50ft, down gradient of Drainfield/ Reserve area.  (view notes)  
Inspections There are 6 required inspections for this application

The list of inspections below are subject to change based on project and permit requirements.

Inspection Date Status  
BLD-Final Inspection (view notes)8/2/2024Pass  
Framing Inspection (view notes)6/7/2023Pass  
Shearwall Inspection (view notes)12/1/2022Pass  
Foundation Wall-Pre-Pour Inspection (view notes)6/3/2022Pass  
Setback Inspection (view notes)5/25/2022Pass  
Footing Inspection (view notes)5/25/2022Pass  
Approval Steps Follow the approval process

Follow your application through the permitting process.

At this time, this permit type cannot be issued through the portal. Once permit is listed as Waiting for Pickup (after approvals and processing), please pick up the permit at our offices at 615 W Alder St., Shelton, WA 98584 during normal business hours.

Step Status Date
Technical Review (view notes) Done 4/28/2022
Planning Review (view notes) Approved with Conditions 2/25/2022
Environmental Health Review (view notes) Approved with Conditions 4/28/2022
Building Review (view notes) Approved 4/7/2022