Water Adequacy Permit: Private or Two-Party Wells
Environmental Health
Record NumberWAT2021-00471
Closed
    Current Fees
$0.00
Additional fees may be required
     
Please complete the following information to submit your permit application.

My Project  

Location  
142 NE DALY DR Parcel
BELFAIR, WA 98528 123052300032
 
 
Created 11/29/2021
Submitted 11/29/2021
Approved 2/22/2022
Issued - -
Closed 2/22/2022
Application Expires 8/21/2022
Give your project a name
Describe the purpose of the project
Contacts  

If you need to update contact information, please reach out to the permit center at 360-427-9670 ext. 352.

Contact Role  
SNOW MICHAEL H & DENISE L(view notes)
DSNOW4@ICLOUD.COM
1.360.710.9879

Submitter of the Application
   
SNOW MICHAEL H & DENISE L(view notes)
DSNOW4@ICLOUD.COM
1.360.710.9879

Owner of Record
   

Contractors  

If you need to update your contractor information, please contact the permit center at 360-427-9670 ext. 352.

Contractor License Number Primary  
HART HOMES LLC (view notes)
harthomesllc@outlook.com
1571 NE TAHUYA BLACKSMITH RD
TAHUYA, WA 98588
HARTHHL853D4
Expires On: 9/4/2026
 

We have not hired a contractor for this project
Details  

(view notes)
(view notes)
(view notes)
(view notes)
(view notes)
Submittals At least 1 file must be uploaded for each submittal requirement  

Please ensure all required submittals have been uploaded. All required submittals must be received prior to routing for review and being considered a complete application. Required submittals are marked with red asterisk unless directed otherwise. Mason County staff will contact you if submittal(s) are found insufficient via email or phone.

Note: Submittal item status may not reflect permit status. Review Approval Step section and Notes section for current status. Applications that were not submitted via the portal may show the submittal section as "Not Completed" even if all documents have been received.

*Required for Application
Required before application can be closed
Submittal Name Received Version Status
Building Site Plan* (view notes)11/29/2021 1 Approved
Satisfactory Bacteriological Sample* (view notes)2/22/2022 1 Approved
Water Well Report (well log) or Capacity Test* (view notes)2/22/2022 1 Approved
Proof of Water Use Limitation Recording (view notes)11/29/2021 1 Approved
Parcels  

If you click on the blue parcel number below, you will be able to view information related to the parcel.

Parcel Number Primary Owner Primary Address
123052300032 (view notes) SNOW MICHAEL H & DENISE L 142 NE DALY DR BELFAIR, WA 98528
Conditions  

The Owner/Applicant agree to the permit conditions at issuance. Prior to issuance, conditions are subject to change.

For applicants wishing to use a spring or surface water for drinking water, other requirements and submittals will apply. Including; Washington State Department of Ecology permit, a Method of disinfection, and an author of statement from owner assuring water quantity meets requirements.  (view notes)  
Determinations do not address adequacy of the distribution system, guarantee an adequate supply of water indefinitely in the future, or guarantee compliance with all applicable WDOE water resource regulations. Recommended approval indicates requirements of Sanitary Code, Title 6, Chapter 6.68.040-Determination of Adequacy for Building Permits are satisfied. Additional Growth Management requirements may apply. Chapter 36.70A RCW.  (view notes)  
The well driller often performs well capacity tests at the time the well is constructed. Results from these tests are noted on the water well report. Results from these tests will be accepted. If the water well report cannot be located by the applicant or if the water well report does not have a capacity test, a well capacity test, which provides stabilization of draw-down and recovery data, must be performed by a licensed contractor.  (view notes)  
Fees Current Fees $0.00

The fees listed below are subject to change based on project and permit requirements. Current fees are listed at the top of this page and may be paid at any time. All fees must be paid at issuance or prior.

Fee Amount Paid Balance Due Now
Total $ 0.00 $ 0.00 $ 0.00 $ 0.00
Approval Steps Follow the approval process

Follow your application through the permitting process.

Step Status Date
Technical Review (view notes) Routed for Review 11/29/2021