| Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X_________________________________
(view notes) | |
Verified on 7/1/2002 |
| Owner/builder assumes all responsibility if drainfield/reserve area is encumbered. X_________________________
(view notes) | |
Verified on 7/10/2002 |
| All construction and demolition debris must be removed from the beach after project completion. Proper disposal of construction debris must be on land in such a manner that debris cannot enter or cause water quality degredation of State waters. X____________________________
(view notes) | |
Verified on 8/9/2002 |
| Approved per dimensions and setbacks on submitted site plan. X_____________________
(view notes) | |
Verified on 8/9/2002 |
| All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour) will be charged and must be collected by the Building Department prior to any further inspections being performed or approvals granted.
X________________________________
(view notes) | |
Verified on 8/9/2002 |
| In accordance with the Uniform Building Code, all sites shall have approved numbers or addresses located in such a position as to be plainly visible and legible from the street or road fronting the property. Mason County Building Department requires that this be completed prior to calling for any site inspections. A re-inspection fee based on rates as adopted by the jurisdiction and the Uniform Building Code will be assessed if the owner and/or contractor fail to post the address on site prior to requesting inspections.
X________________________________
(view notes) | |
Verified on 8/9/2002 |
| The plan review check list and corrections, along with the Energy Compliance Worksheet (when applicable) are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or removal of approved documents will result in failure of required building inspections.
X________________________________
(view notes) | |
Verified on 8/9/2002 |
| This structure is approved as un-heated space. If at any time this building is to be used for anything other than what it is approved for, a change of use permit shall be applied for, reviewed and approved prior to the change.
X________________________________
(view notes) | |
Verified on 8/9/2002 |
| THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOIL. X____________________________
(view notes) | |
Verified on 8/9/2002 |
| The "approved" plot plan is required to be on-site for inspection purposes. If an inspection is requested and the "approved" plot plan is not on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour) will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted.
X________________________________
(view notes) | |
Verified on 8/9/2002 |
| This structure is limited to U-1 use only (private garages, carports, sheds, and agricultural buildings.) Any other use will be in violation of the Uniform Building Code and Mason County Regulations unless a "Change of Use" permit is applied for, reviewed and approved.
X_________________________________
(view notes) | |
Verified on 8/9/2002 |
| All changes to "approved" building plans that effect compliance with the Uniform Codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction.
X_________________________________
(view notes) | |
Verified on 8/9/2002 |
| The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the Uniform Codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections.
X_________________________________
(view notes) | |
Verified on 8/9/2002 |
| All property lines shall be clearly identified at the time of foundation inspection. X__________________________________
(view notes) | |
Verified on 8/9/2002 |
| All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations.
X__________________________________
(view notes) | |
Verified on 8/9/2002 |
| All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have prevented action from being taken. No more than one extension may be granted.
X__________________________________
(view notes) | |
Verified on 8/9/2002 |